Skip to main content

General Information

Provider

FirstLight

Colo Space

NULL SF

Airport

N/A

Year Built

N/A

Security

On-site

Uptime

N/A

Hyperscale

Not Enabled

Retail

Not Available

Wholesale

Not Available

Interconnectivity

Available

Overview

FirstLight’s Bedford, NH Data Center is an ideal location for production and disaster recovery deployments. Conveniently located off of Route 293 and Route 3 and less than ten minutes from Manchester-Boston Regional Airport, this facility supports dense server and storage environments. It is directly connected to FirstLight’s fiber optic networks for high-speed access to the Internet and private networks.

Power & Infrastructure

Power Density

High-density power deployment available

Utility Feeders

N/A

UPS

Redundant (2N) power (Power available in 110V, 208V, or 3-Phase configurations)

Standby Power

N/A

Cooling

Fully redundant cooling system

Flood Zone

N/A

Seismic Rating

N/A

Fire Suppression

Dry-pipe pre-action fire suppression system

Fire Detection

Advanced fire and smoke detection system

Amenities

  • Anti-static raised floor environment
  • Secure full and half cabinets
  • Secure multi-rack cages in flexible configurations
  • Facility roof rights available
  • Ample on-site parking available
  • On-site remote hands
  • Advanced infrastructure monitoring including leak/water detection system
  • 24x7 customer access

Other Information

Network Providers

Diverse fiber optic entry, Connections to multiple cloud providers and Mass IX, Layer 2 network for site-to-site customer connectivity, Cross connect service available to multiple regional and fiber optic networks

Media

No media available.

Contact Bedford Data Center

Complete the form to get your information reviewed by Bedford Data Center